Mep Work Progress Report Sample Info

Insulation of chilled water piping is 60% complete on Floor 4.

At its core, an MEP Work Progress Report serves as a formal, timestamped snapshot of the installation status of these three intertwined disciplines. A typical sample report is divided into four key sections. First, the provides a high-level overview of overall completion percentage (e.g., "MEP overall: 68% complete") and highlights critical issues—such as a delay in the delivery of air handling units. Second, the Discipline Breakdown offers granular detail: Mechanical (ductwork, piping, HVAC units), Electrical (wiring, panels, lighting), and Plumbing (sanitary, storm, domestic water). Third, the Resource Tracking section logs labor hours, manpower on site, and equipment usage. Finally, the Risk and Look-ahead section lists current obstacles (e.g., clash between fire sprinkler lines and structural beams) and outlines the plan for the next week. mep work progress report sample

| Discipline | Activity Description | Location | Planned % | Actual % | Variance | Remarks | | :--- | :--- | :--- | :--- | :--- | :--- | :--- | | | Supply Air Duct Installation | Floor 5 | 70% | 65% | -5% | Minor delay due to architectural clash. | | Mechanical | VRF Piping Works | Floor 6 | 40% | 40% | 0% | On schedule. | | Electrical | Cable Tray Installation | Basement 1 | 90% | 95% | +5% | Ahead of schedule. | | Electrical | LV Switchgear Erection | Main Room | 20% | 15% | -5% | Awaiting cable gland delivery. | | Plumbing | Sanitary Drainage Piping | Floor 4 | 100% | 100% | 0% | Ready for pressure test. | | Fire Fighting | Sprinkler Head Installation | Floor 3 | 50% | 50% | 0% | On schedule. | Insulation of chilled water piping is 60% complete